"How long will we be without a bathroom?" is one of the first questions people ask us. The honest answer is that it depends on what's being done, but most bathroom fits follow the same stages. Knowing what happens when makes it far easier to plan around.

The short answer
A standard bathroom, where the bath, basin and toilet stay in roughly the same places, typically takes around one to two weeks from strip-out to finished room. A wet room, a change of layout or new underfloor heating usually adds several days because of the extra floor work and drying times.
Stage by stage
Strip-out
The old suite, tiles and often the floor come out, and the water and electrics are made safe. This is usually done in a day, and it's when any hidden problems, such as rotten boards or old leaks, come to light.
First fix
New pipework, waste runs and cables go in while the walls and floor are open. If the toilet or shower is moving, this is where most of the time goes.
Boarding and waterproofing
Walls and floors are boarded with materials designed for wet areas, and showers and wet rooms are waterproofed. Some waterproofing products need time to cure before tiling can start.
Tiling
Often the longest single stage. Large-format tiles, patterns, niches and full-height tiling all take longer, and the adhesive and grout need time to set.
Second fix and finishing
The suite, taps, shower, towel rail, lighting and extractor fan are connected and tested, then everything is sealed and the room is cleaned.
What makes a bathroom fit take longer
- Moving the toilet, which means rerouting the soil pipe
- A wet room or level-access shower, which needs the floor building up or dropping to create the fall to the drain
- Underfloor heating and the screed or levelling over it
- Floor repairs once the old floor is up
- Bespoke items with long lead times, such as made-to-measure glass
Living with the work
If it's your only bathroom, talk to your fitter at the quoting stage about how they'll keep you going, particularly with the toilet and a way to wash. Clearing the room and the route to it before day one, and agreeing working hours, makes the whole job smoother.
Why planning saves time
Most delays on a bathroom fit come from waiting: for a trade, for a missing part or for a decision. When the suite and tiles are on site before the strip-out and one team handles the plumbing, electrics and tiling, the stages run back to back.
See how we plan and fit bathrooms in Derby, read about the bathroom renovation mistakes to avoid, or get in touch for a free quote and a timetable for your job.